Coordinate irrigation zones, controls and service access with the planting schedule. Review any existing system before deciding what can be retained or extended.
Coordinate irrigation zones, controls and service access with the planting schedule. Review any existing system before deciding what can be retained or extended. Your proposal identifies the agreed work packages, material choices and responsibilities for your specific property.
01
Existing-system review
02
Zone and connection plan
03
Controls and installation
04
Testing and handover
BEFORE DESIGN IS FINALISED
The right questions at the right time.
Which areas have different watering needs?
What supply is available?
How can the system be maintained?
We work through these decisions using the existing property information, site conditions and your priorities. Any specialist review or approval responsibility is identified in the project proposal.
BUDGET & PROGRAMME
Start with the scope.
A useful price follows measured quantities and an agreed specification. For irrigation systems, the scope and installation interfaces matter as much as the visible finish.
The programme separates design, external reviews, procurement and site work. It also records the decisions needed from you before orders or installation can proceed.
An irrigation brief should connect the planting plan with water supply information, exposure and maintenance access. Areas with different needs may require separate control. Ask the specialist to explain the proposed zones, equipment and adjustment process. Labelled valves, accessible filters and an operating guide make the system easier to inspect and adapt as the garden establishes.
Keep the agreed choices with the current drawings and specification. Identify who designs, supplies and installs each element, and how the work connects to neighbouring packages.
The proposal should also record any remaining investigations, product information and handover requirements. Resolve changes in writing so their effect on the scope and programme can be reviewed.
A garden has shaded beds, exposed planting and containers that are being treated as one area. Ask the irrigation and landscape specialists to review the actual plants, conditions and system. Compare the proposed arrangement with the garden's varied needs instead of assuming a single schedule is appropriate. The owner should receive an understandable record of areas served and a clear route for reporting observations during establishment.
A SCOPE YOU CAN REVIEW
What to resolve in the proposal
Identify design, equipment selection, installation and commissioning responsibilities. Request a zone record linked to the planting plan, with relevant product information and operating guidance. Clarify who monitors and adjusts the system under the agreed care arrangement. Technical sizing and programming should follow the actual specialist design rather than a generic watering prescription.
Connect zones to the planting plan and real exposure
Review proposed zones against plant groups, sun and shade, soil or container conditions and the layout of paved areas. A plan should make clear which beds or pots are served together and where different needs require a separate decision. Ask the appointed specialists to assess supply, coverage and product selection; a website checklist is not a watering schedule for a particular garden.
Walk the drawing from the controller to each area and note filters, valves and inspection points. Keep them reachable after planting matures and finishes are installed. Where future garden changes are likely, ask what provision can be documented now without oversizing or prescribing equipment before the actual specialist design is complete.
Use establishment observations to refine the handover
Agree who observes the new planting, how concerns are reported and who can adjust the system under the care arrangement. Look for inconsistent coverage, runoff, leaks or signs that different areas are responding differently, then refer those observations to the responsible specialist. Avoid changing a generic timer setting without understanding the actual zone, planting and weather conditions.
The handover should include an understandable zone record, controller and equipment information, access locations and the agreed adjustment process. Keep the current planting plan with it. Record later planting changes, because replacing a group or changing a container can alter the assumptions behind the original zone even when the visible irrigation hardware has not moved.
CONNECTED SCOPE
Plan the neighbouring decisions.
These related services often meet this scope at shared drawings, finishes, services or handover points.