Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Verdelle / Materials & makers

Chosen with intention.

A starting point for your specification conversation. Explore materials and established product makers, then select against your project’s actual requirements.

Layers of green — design concept
Irrigation systems

Hunter

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Irrigation controls

Rain Bird

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection

Brand names identify products for consideration. They do not imply an authorised dealership, endorsement or partnership. Availability, supply, installation and manufacturer warranty terms are confirmed for the selected products.

From inspiration
to specification.

Review samples in the setting where they will be used. Consider cleaning, maintenance, exposure and the details where materials meet. Final product information should be coordinated with the drawings before purchasing or fabrication.

Discuss your material brief
THE SPECIFICATION NOTEBOOK

Choose with the whole life of the material in mind.

Compare the use, installation and care of each selected product. Samples establish a direction; the final schedule should identify the exact references, locations, quantities and responsible suppliers.

Planted courtyard concept with raised beds, groundcover and discreet irrigation tubing.
Original design concept

Planting and soil systems

Where it contributes
Creating structure, shade, texture and seasonal interest.
Before approval
Confirm botanical names, quantities, nursery sizes, soil preparation and establishment responsibilities.
After installation
Keep a site-specific watering and care plan that can be adjusted as planting establishes.

Gravel, mulch and planting edges

Where it contributes
Defining planting areas and supporting the chosen landscape character.
Before approval
Review the material, depth, edging and relationship to drains, doors and maintenance access.
After installation
Plan periodic checks for displaced material, weeds and blocked edges.

Paving and irrigation components

Where it contributes
Providing the structure and water delivery that the visible garden relies on.
Before approval
Coordinate levels, joints, drainage, valves, filters, emitters and access to controls.
After installation
Retain the system layout, controller guidance and maintenance contact details.

Further product and planning research

Use current information from the relevant manufacturer or authority for the actual scope. These references do not imply a supplier partnership or endorsement.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your landscape design brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry