Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
DESIGN STUDY / 02

Layers of green

An original landscape design concept exploring how material, proportion and practical use can work together.

Layers of green — original design concept
Original design concept · Verdelle Landscapes

The brief

Gardens planned for use, water, shade and long-term care. This study explores a setting where daily use and a clear visual language guide the design together.

The design thinking

Verdelle creates a thoughtful framework for gardens: planting, paths, shade, water and places to pause. We plan around the site and the level of care you want to give it. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.

From concept to your property

A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.

  • Site preparation, levels and drainage
  • Paving area and hardscape detail
  • Plant sizes, quantities and irrigation
  • Features, lighting and establishment care
Develop a brief like this
THE STUDY IN DETAIL

A closer look at the detail.

The planting vision depends on exposure, soil conditions, levels and the care the owner wants to provide after handover.

Original design concept

Concept: residential garden

The detail study narrows the wider brief to layers of green. Create shade, paths and places to pause through a layered planting plan supported by practical irrigation and maintenance access.

Design decisions

  • Review existing trees and features before proposing removal.
  • Coordinate hardscape, drainage and irrigation before planting locations are fixed.
  • Agree plant sizes and the establishment-care responsibilities in the scope.
PROPOSED PROJECT TIMELINE

From the first brief to handover.

A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.

  1. Stage 1

    Discovery & measured brief

    Create shade, paths and places to pause through a layered planting plan supported by practical irrigation and maintenance access.

    Review point · A scope and responsibility record
  2. Stage 2

    Design & coordinated specification

    Review existing trees and features before proposing removal.

    Review point · A reviewed drawing and specification package
  3. Stage 3

    Selections & procurement planning

    Coordinate hardscape, drainage and irrigation before planting locations are fixed.

    Review point · A selection register and supply responsibilities
  4. Stage 4

    Proposed delivery sequence

    Agree plant sizes and the establishment-care responsibilities in the scope.

    Review point · Staged inspections and change records
  5. Stage 5

    Review & handover planning

    Review the agreed scope and record outstanding items before completion is accepted.

    Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY

Details that can be reviewed.

Concept palette

  • Layered green planting
  • Textured pale paving
  • Natural gravel and shade-tree structure

Proposed quality records

  • A surveyed site and retained-plant record
  • Coordinated planting and irrigation schedules
  • Establishment and seasonal-care responsibilities

The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.

Our project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your landscape design brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry